DEMO: a fictional business built by Vulpesco. Prices are assumptions, images are AI-generated and nothing you enter is sent.

About this demo
Skip to content
Sillform Studio Prepare a briefBrief

Illustrative home study · fictional household

A resale reset

Renew rooms and the known service scope together in a 30-year-old, 90 m² HDB 4-room flat.

Home
HDB 4-room resale, 90 m²
Rooms
3 bedrooms, 2 bathrooms
Selected works allowance
S$74,000–131,500Not a whole-project total
Whole journey
16–26 weeks
01

Kitchen

Replace
Renewed peach and oak kitchen with terrazzo worktop, retaining the original layout.
What stays
The planned room layout; any later structural change needs review.
What changes
Kitchen joinery, fixtures and the floor finish are replaced.
Still to check
What concealed conditions will need recording after removal?
02

Living

Replace
Furnished warm plaster living room retaining its beige ceramic floor.
What stays
No room joinery or ordinary floor finish is selected to stay.
What changes
Living-room joinery and floors are replaced.
Still to check
Which measured quantities go into the written scope?
03

Bathrooms

Replace
Refreshed celadon bathroom with pale oak vanity and terrazzo floor.
What stays
No bathroom finish is selected to stay.
What changes
Both bathrooms, their finishes, waterproofing and testing are included as separate lines.
Still to check
Who checks the permit scope and approved programme?
04

Bedrooms

Replace
Celadon bedroom with pale linen bed, keeping the original wardrobe and floor.
What stays
No bedroom joinery is selected to stay.
What changes
All three bedrooms and the ordinary floor finish are replaced.
Still to check
When will off-site carpentry be measured and ordered?
05

Utility

Replace
What stays
No utility fittings are selected to stay.
What changes
Utility fittings, whole-home wiring and pipes are replaced in the model.
Still to check
What is still excluded once the home is opened up?
Two hands measuring an existing kitchen cabinet door with a plain steel tape measure.
Measured before anything was ordered. Illustrative, AI-generated

The allowance, line by line

Design, coordination and protection
S$4,000–6,000
Living, replace
S$5,000–9,000
Kitchen, replace
S$12,000–19,000
Kitchen fixtures, replace
S$600–1,200
Bathroom 1, replace
S$2,000–3,500
Bathroom 1 fixtures, replace
S$1,000–1,800
Bathroom 2, replace
S$2,000–3,500
Bathroom 2 fixtures, replace
S$1,000–1,800
Bedroom 1, replace
S$3,500–6,000
Bedroom 2, replace
S$3,500–6,000
Bedroom 3, replace
S$3,500–6,000
Utility, replace
S$2,500–4,500
Floors outside the bathrooms, replace (82 m²)
S$7,380–11,480
Bathroom 1 tiles and waterproofing, replace
S$3,000–5,000
Bathroom 2 tiles and waterproofing, replace
S$3,000–5,000
Haulage and disposal
S$1,000–2,000
Whole-home electrical, replace
S$5,000–9,000
Whole-home plumbing, replace
S$2,000–4,000
Selected works allowance, with GST and reserve
S$74,000–131,500

Outside this amount

Fictional allowances, model dated 12 October 2026. Not a quotation. Site work 8–14 weeks; whole journey 16–26 weeks; permit conditions govern.

Try this plan

The choices in this home

Renew rooms and the known service scope together in a 30-year-old, 90 m² HDB 4-room flat.

Sample plan

HDB 4-room resale, 90 m², 3 bed, 2 bath, 30-year block

Selected works allowance

S$74,000–131,500

Not a whole-project total. Includes modelled 9% GST and a 10–15% reserve. Fictional prices, model dated 12 October 2026.

Renew rooms and the known service scope together in a 30-year-old, 90 m² HDB 4-room flat.

Timing
8–14 weeks on site, 16–26 weeks overall
Outside the allowance
No unresolved systems. Unpriced exclusions still apply.
Open the full planner

Open the full planner to explore these choices. Open the full planner