Kitchen first example

Fixed example: HDB 4-room resale, 90 square metres, 3 bedrooms, 2 bathrooms, building age not sure. Kitchen replaced; living room and both bathrooms refreshed; bedrooms, utility, floors and tiles kept; wiring and pipes not sure; no structural change. Selected works allowance S$26,500 to S$46,500 including modelled GST and reserve (as of 2026-10-12). Wiring and pipes stay outside it until inspected. Provisional timing: 8 to 14 weeks on site, 16 to 26 weeks overall; permit conditions govern.

The fixed choices

Illustrative assumptions, model dated 12 October 2026. These choices are fixed in this example; the interactive planner starts with the kitchen-first plan.

Home
HDB 4-room resale, 90 m², 3 bedrooms, 2 bathrooms
living
refresh
kitchen
replace
bathroom 1
refresh
bathroom 2
refresh
bedroom 1
keep
bedroom 2
keep
bedroom 3
keep
utility
keep
Floors outside the bathrooms
keep
bathroom 1 finishes
keep
bathroom 2 finishes
keep
Whole-home electrical
Not sure
Whole-home plumbing
Not sure
Building age
Not sure
Structural intention
no

Selected works allowance

S$26,500–46,500

Includes modelled 9% GST and a 10 to 15% reserve. Not a whole-project total or a quotation.

Design, coordination and protection
S$4,000–6,000
living
S$2,500–4,500
kitchen
S$12,000–19,000
kitchen fixtures
S$600–1,200
bathroom 1
S$1,000–1,500
bathroom 1 fixtures
S$200–500
bathroom 2
S$1,000–1,500
bathroom 2 fixtures
S$200–500
Haulage and disposal
S$1,000–2,000
Before GST and reserve
S$22,500–36,700
GST on selected work
S$2,025–3,303
Reserve including GST
S$2,453–6,000

Outside this amount

Whole-home electricalUnresolved or conditional; not included
S$5,995–11,282
Whole-home plumbingUnresolved or conditional; not included
S$2,398–5,014

Structural changes, concealed defects, appliances, air-conditioning, windows, loose furniture, accommodation and refundable management deposits remain unpriced. Inspection, approvals and an itemised written scope come next.

Order and timing

Provisional site work 8 to 14 weeks; whole journey 16 to 26 weeks. Actual scope and permit conditions govern. Approved work in an existing HDB block must fit its one-calendar-month permit window.