Plan by room
One row per room. Choose what stays, what gets refreshed and what gets replaced, and see what the choices add up to and what they leave out.
Scope planner · fictional prices
What stays. What changes.
Choose Keep, Refresh or Replace for each room. The allowance updates as you go and lists what it leaves out.
Joinery, fittings and finishes in each room. Floors and bathroom tiles are separate choices in C.
-
LivingLiving and dining joinery, walls and lighting
S$2,500–4,500
-
KitchenCabinets, worktop, backsplash, sink and tap
S$12,600–20,200
-
Bathroom 1Vanity, mirror and sanitary fittings
S$1,200–2,000
-
Bathroom 2Vanity, mirror and sanitary fittings
S$1,200–2,000
-
Bathroom 3Vanity, mirror and sanitary fittings
Add a room above to plan it.
Not in this home
-
Bedroom 1Wardrobes, walls and lighting
No work priced
-
Bedroom 2Wardrobes, walls and lighting
No work priced
-
Bedroom 3Wardrobes, walls and lighting
No work priced
-
Bedroom 4Wardrobes, walls and lighting
Add a room above to plan it.
Not in this home
-
UtilityUtility and service-yard fittings
No work priced
-
Floors outside the bathrooms82 m² outside the bathrooms
No work priced
-
Bathroom 1 tiles and waterproofingOverlay goes on the old tiles; Replace includes waterproofing and testing
No work priced
-
Bathroom 2 tiles and waterproofingOverlay goes on the old tiles; Replace includes waterproofing and testing
No work priced
-
Bathroom 3 tiles and waterproofingOverlay goes on the old tiles; Replace includes waterproofing and testing
Add a bathroom above to plan it.
Not in this home
-
Whole-home electricalWiring, circuits and the distribution board
Outside the total until inspected
-
Whole-home plumbingSupply and waste pipes
Outside the total until inspected
-
Wall removal or structural changeNot priced here. Yes or Not sure asks for a professional review.
Not planned
Your plan
3 bedrooms, 2 bathrooms, 90 m². Schematic, not to scale.
- Keep 4
- Refresh 3
- Replace 1
Selected works allowance
S$26,500–46,500
Not a whole-project total. Fictional planning range including 9% GST and a 10–15% reserve for the selected works. See unresolved allowances and exclusions.
3 rooms to refresh, 1 to replace, 4 to keep. All floor and bathroom finishes retained. Whole-home electrical and plumbing unresolved.
In the range
- Design, coordination and protection
- S$4,000–6,000
- Condo access and management allowance
- Condo only
- Living, refresh
- S$2,500–4,500
- Kitchen, replace
- S$12,000–19,000
- Kitchen fixtures, replace
- S$600–1,200
- Bathroom 1, refresh
- S$1,000–1,500
- Bathroom 1 fixtures, refresh
- S$200–500
- Bathroom 2, refresh
- S$1,000–1,500
- Bathroom 2 fixtures, refresh
- S$200–500
- Haulage and disposal
- S$1,000–2,000
- Selected works before GST
- S$22,500–36,700
- GST at 9%
- S$2,025–3,303
- Reserve of 10–15%, with GST
- S$2,453–6,000
Each end is rounded outward to the nearest S$500.
Outside this amount
- Whole-home electricalNot added to the total
- S$5,995–11,282S$5,000–9,000 before GST and reserve
- Whole-home plumbingNot added to the total
- S$2,398–5,014S$2,000–4,000 before GST and reserve
Not priced at all
- Structural changes and wall removal
- Concealed defects found during work
- Appliances, air-conditioning and loose furniture
- Windows, balcony changes and decorative lights
- Temporary accommodation and storage
- Refundable management deposits
Timing
- Whole journey
- 16–26 weeks
- Site work
- 8–14 weeks
- Permit conditions
- Approved work in an existing HDB block must finish within one calendar month of the permit date. The site band does not override it.
- 01Brief and measurement
- 02Written design and material decisions
- 03Permissions and access
- 04Protection
- 05Removal of replaced joinery and finishes (no wall demolition)
- 06Refresh work on retained joinery
- 07Carpentry made off site, then fitted
- 08Snagging, agreed fixes and documents
- Building age not given. Confirm the block or building completion date; the provisional band stays.
- Whole-home electrical and plumbing are unresolved. Their allowances sit outside the total until inspection decides.
- The appointed DRC contractor checks which HDB permits apply. Approved work in an existing block must finish within one month of the permit date.
Fictional allowance model, 12 October 2026 · not a quotation.
Planning with your own assistant?
Copy a short note about the studio and this planner, paste it into the assistant you use, and bring what it prepares back to Prepare a brief.
Copies a short note about us for your AI assistant.
How the range is worked out
Rooms
Each room has a fictional rate for Refresh and Replace. Living rooms, bedrooms and utility rooms scale with your floor area; kitchens and bathrooms do not. Kitchens and bathrooms add a fixtures allowance.
GST and reserve
The selected works get 9% GST, then a reserve of 10% at the low end and 15% at the high end. Both ends are rounded outward to the nearest S$500.
What stays outside
Wiring and pipes you are not sure about, structural review, concealed defects, appliances and management deposits never join the total. The planner lists them beside it instead.
Read a fixed example
Each page keeps its choices and answer in HTML, including without JavaScript.