Whole flat example

Fixed example: the same 90 square metre HDB 4-room flat in a 30-year-old block, with every room, the floors, both bathroom finishes, wiring and pipes replaced and no structural change. Selected works allowance S$74,000 to S$131,500 including modelled GST and reserve (as of 2026-10-12). Provisional timing: 8 to 14 weeks on site, 16 to 26 weeks overall. Structural work and concealed defects stay outside it.

The fixed choices

Illustrative assumptions, model dated 12 October 2026. These choices are fixed in this example; the interactive planner starts with the kitchen-first plan.

Home
HDB 4-room resale, 90 m², 3 bedrooms, 2 bathrooms
living
replace
kitchen
replace
bathroom 1
replace
bathroom 2
replace
bedroom 1
replace
bedroom 2
replace
bedroom 3
replace
utility
replace
Floors outside the bathrooms
replace
bathroom 1 finishes
replace
bathroom 2 finishes
replace
Whole-home electrical
replace
Whole-home plumbing
replace
Building age
30 years
Structural intention
no

Selected works allowance

S$74,000–131,500

Includes modelled 9% GST and a 10 to 15% reserve. Not a whole-project total or a quotation.

Design, coordination and protection
S$4,000–6,000
living
S$5,000–9,000
kitchen
S$12,000–19,000
kitchen fixtures
S$600–1,200
bathroom 1
S$2,000–3,500
bathroom 1 fixtures
S$1,000–1,800
bathroom 2
S$2,000–3,500
bathroom 2 fixtures
S$1,000–1,800
bedroom 1
S$3,500–6,000
bedroom 2
S$3,500–6,000
bedroom 3
S$3,500–6,000
utility
S$2,500–4,500
Floors outside the bathrooms
S$7,380–11,480
bathroom 1 finishes
S$3,000–5,000
bathroom 2 finishes
S$3,000–5,000
Haulage and disposal
S$1,000–2,000
Whole-home electrical
S$5,000–9,000
Whole-home plumbing
S$2,000–4,000
Before GST and reserve
S$61,980–104,780
GST on selected work
S$5,578–9,430
Reserve including GST
S$6,756–17,132

Outside this amount

Structural changes, concealed defects, appliances, air-conditioning, windows, loose furniture, accommodation and refundable management deposits remain unpriced. Inspection, approvals and an itemised written scope come next.

Order and timing

Provisional site work 8 to 14 weeks; whole journey 16 to 26 weeks. Actual scope and permit conditions govern. Approved work in an existing HDB block must fit its one-calendar-month permit window.