Structural review example

Fixed example: the kitchen-first plan with a structural change intended. Selected works allowance S$26,500 to S$46,500 for the room work only (as of 2026-10-12); no structural work is priced. A professional review comes first, so no site or overall timing is given, and the review, wiring and pipes stay outside the allowance.

The fixed choices

Illustrative assumptions, model dated 12 October 2026. These choices are fixed in this example; the interactive planner starts with the kitchen-first plan.

Home
HDB 4-room resale, 90 m², 3 bedrooms, 2 bathrooms
living
refresh
kitchen
replace
bathroom 1
refresh
bathroom 2
refresh
bedroom 1
keep
bedroom 2
keep
bedroom 3
keep
utility
keep
Floors outside the bathrooms
keep
bathroom 1 finishes
keep
bathroom 2 finishes
keep
Whole-home electrical
Not sure
Whole-home plumbing
Not sure
Building age
Not sure
Structural intention
yes

Selected works allowance

S$26,500–46,500

Includes modelled 9% GST and a 10 to 15% reserve. Not a whole-project total or a quotation.

Design, coordination and protection
S$4,000–6,000
living
S$2,500–4,500
kitchen
S$12,000–19,000
kitchen fixtures
S$600–1,200
bathroom 1
S$1,000–1,500
bathroom 1 fixtures
S$200–500
bathroom 2
S$1,000–1,500
bathroom 2 fixtures
S$200–500
Haulage and disposal
S$1,000–2,000
Before GST and reserve
S$22,500–36,700
GST on selected work
S$2,025–3,303
Reserve including GST
S$2,453–6,000

Outside this amount

Whole-home electricalUnresolved or conditional; not included
S$5,995–11,282
Whole-home plumbingUnresolved or conditional; not included
S$2,398–5,014
Professional Engineer reviewUnresolved or conditional; not included
S$959–2,507

Structural changes, concealed defects, appliances, air-conditioning, windows, loose furniture, accommodation and refundable management deposits remain unpriced. Inspection, approvals and an itemised written scope come next.

Order and timing

Professional review comes first. No numeric site or overall schedule is given; structural work is not priced.